Previous page Next page

WRG Canal Camp 2008

Ralph's first experience of a Waterway Recovery Group project - a great week on the Monmouthshire and Brecon canal near Newport, Wales

Richard supervising

Hanging the lock gate 2

Hanging the lock gate 3

Hanging the lock gate 4

The lock gate in position

The gang at rest 1

The gang at rest 2

The gang at rest4

Jalbum 8.3 Copyright: Ralph Mills 2008