Canal Camp 2009

This year we worked on Tyfynnon Lock, near Malpas, removing vegetation, digging out the overflow channel (I especially enjoyed this activity!) and repointing the embankment retraining wall. It was a damp week, and on a particularly wet day we abandoned work and visited The Big Pit mining museum.

BACK TO INTRODUCTION

Created using jAlbum 9 and Expo-1 (powered by Exposure).
Create online photo albums with jAlbum